Bright Path Contracting

Painting · General Contractor
(503) 555-0148 quotes@brightpathco.com brightpathco.com
Committed
$21,992.00
Pending
$10,150.00
Paid
$0.00
Balance
$21,992.00
Every line is editable — two ways, both equal. Tell Claude change R1718-01 to $21,000 (each line carries a ref), or ask for the estimate as an editable Excel file, change the cells, and drop it back in the inbox. Bright Path original (v1) is never touched — every redline is measured against exactly what he sent.

3 estimates · newest first · click a row to drill into a line

#1950k Options menu Jul 8, 2026 Working redline $11,030.00computed
✓ReceivedJul 9
2Your redlinein progress
·Sent—
·Final—

An options menu — each option is a proposed decision, not a commitment. Accept in conversation and only then does it hit the committed budget.

RefLine itemRoomTradeQty × rateTotalDecisionEdit
R1950-01Kitchen island cabinet runOption 3 — full islandKitchencabinets1 × $2,200.00$2,200.00◌proposed
R1950-02Kitchen island cabinet runOption 2 — peninsulaKitchencabinets1 × $1,800.00$1,800.00✕declined
R1950-03Kitchen island cabinet runOption 1 — galleyKitchencabinets1 × $1,450.00$1,450.00✕declined
R1950-04Vanity cabinets2 vanitiesDownstairs Office Bathcabinets2 × $600.00$1,200.00◌proposed
R1950-05Vanity cabinetUpstairs Hallway Bathcabinets1 × $600.00$600.00◌proposed
R1950-06Bathroom exhaust fanUpstairs Office Bathelectrical1 × $420.00$420.00◌proposed
R1950-07Garage epoxy floorOption 1Garageepoxy1 × $3,360.00$3,360.00◌proposed
R1950-08Vanity light fixturesUpstairs Hallway Bathelectrical1 × TBD—?tbd
R1950-09Vanity light fixturesUpstairs Office Bathelectrical1 × TBD—?tbd
Computed total (all priced lines)$11,030.00

Printed document total is $0.00 — pricing lives in the line descriptions. Computed total $11,030.00 is what we track; accepting options moves them into committed.

Working redline — edit any line, then send back.
#1949k Estimate Jul 8, 2026 Sent — awaiting $5,760.00document
✓ReceivedJul 9
✓Your redlineJul 20
3SentJul 21
·Final—

2 changed · 0 removed · 1 added   Your redline is out with Bright Path — locked until he responds. Re-import his reply to open the next version.

RefLine itemRoomTradeQty × rateTotalDecisionEdit
R1949-01Repaint garage interior & ceiling$2,650.00 → $2,400.00 changedGaragepainting$2,650 1 × $2,400.00$2,400.00◌proposed
R1949-02Patch, prep & caulkadded scope addedWhole Housetrim1 × $1,080.00$1,080.00◌proposed
R1949-03Stair balustrade repaint$2,410.00 → $2,280.00 changedMain Staircasepainting$2,410 1 × $2,280.00$2,280.00◌proposed
Computed total$5,760.00

Document total and computed lines agree to the cent.

Sent Jul 21 — locked while out for approval.
#1718k Base contract Feb 3, 2026 Final $21,992.00accepted
✓ReceivedFeb 3
✓Your redlineFeb 6
✓SentFeb 7
✓FinalFeb 10

1 changed · 1 removed · 1 added   Signed by both. These accepted lines are the authority everywhere; the earlier version’s lines are kept for history but out of every total.

RefLine itemRoomTradeQty × rateTotalDecisionEdit
R1718-01Full interior repaintwalls, ceilings, trim, doors · $22,800 → $20,292 changedWhole Housepainting$22,800 1 × $20,292.00$20,292.00✓accepted
R1718-02Debris haul-away & disposalWhole Housedisposal1 × $620.00$620.00✓accepted
R1718-03Patch & minor repair allowanceadded in redline addedWhole Housetrim1 × $1,080.00$1,080.00✓accepted
R1718-04Pressure-wash exterior sidingremoved in redline removedWhole Houseother1 × $1,450.00$1,450.00⌀superseded
Accepted total — the authority everywhere$21,992.00
FINAL & immutable. This is the number everywhere — Budget, Dashboard, exports. Post-final changes require a new change-order estimate linked to this chain.